In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This practical guide follows the journey from bare runways to a commissioned crane ready for service. You’ll see final load testing and handover—with the same checklists pro installers use.
Overhead Crane, Defined
An overhead crane rides on parallel runways anchored to a anderson construction building frame, carrying a trolley-mounted hoist for precise, vertical picks. The result is smooth X-Y-Z motion: long-travel along the runway.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Less manual handling, fewer delays.
Lower risk during rigging, lifting, and transport inside facilities.
Support for pipelines, structural steel, and big machinery installs.
What This Install Includes
Runways & rails: continuous beams and rail caps.
End trucks: motorized gearboxes for long-travel.
Bridge girder(s): cambered and pre-wired.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: power supply, festoon or conductor bars.
Stops, bumpers & safety: end stops, buffers, travel limits.
Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.
Before the First Bolt
A clean install is mostly planning. Key steps:
Drawings & submittals: Approve general arrangement (GA), electrical schematics, and loads to the structure.
Permits/JSAs: Job Safety Analysis (JSA) for each lift step.
Runway verification: Check baseplates, grout pads, and anchor torque.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Mark crane components with ID tags.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Tiny survey errors balloon into hours of rework. Measure twice, lift once.
Getting the Path Right
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: Laser or total station to set rail height.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Install and torque per spec.
Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.
Log final numbers on the ITP sheet. Misalignment shows up as crab angle and hot gearboxes—don’t accept it.
Lifting the Bridge
Rigging plan: Choose spreader bars to keep slings clear of electricals. Taglines for swing control.
Sequence:
Lift end trucks to runway level and set temporarily on blocks.
Rig the bridge girder(s) and make the main lift.
Land the bridge on the end trucks and pin/bolt per GA.
Measure diagonal distances to confirm squareness.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.
Cross-Travel Setup
Trolley installation: Hoist/trolley arrives pre-assembled or as modules.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Set upper/lower limit switches.
Cross-travel adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Don’t mask issues with higher VFD ramps.
Electrics & Controls
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Secure junction boxes; label everything for maintenance.
Future you will too. Photos of terminations help later troubleshooting.
QA/QC & Documentation
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Re-check after 24 hours if required.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Document bump tests.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Ready for Work
Static load test: Hold at mid-span and near end stops; monitor deflection and brake performance.
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Maintenance intervals for rope, brakes, and gearboxes.
Only after these pass do you hand over the keys.
Where These Cranes Shine
Construction & steel erection: handling long members safely.
Oil & gas & power: moving heavy pumps, skids, and pipe spools.
Steel mills & foundries: large part transfer.
Warehousing & logistics: high throughput lanes.
Floor stays clear, production keeps flowing, and precision goes up.
Do It Safe or Don’t Do It
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: clear isolation points for electrical work.
Fall protection & edges: approved anchor points, guardrails on platforms, toe boards.
Runway integrity: regular runway inspection plan.
Duty class selection: match crane class to cycles and loads.
A perfect lift is the one nobody notices because nothing went wrong.
If It Doesn’t Run Smooth
Crab angle/drift: re-check runway gauge and wheel alignment.
Hot gearboxes: misalignment or over-tight brakes.
Rope drum spooling: check fleet angle and sheave alignment.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: lubrication and alignment issues.
A 10-minute weekly check saves days of downtime later.
Quick Answers
Overhead vs. gantry? Choose per site constraints.
Single vs. double girder? Span and duty class usually decide.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
What You’ll Take Away
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.
Looking for a clean handover databook index you can reuse on every project?
Grab the installer pack and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.
...
Read more arabic articles...
read more about this products